Skip to content Transforming your infrastructure into living assets

Accra-Tema Motorway

Service provided:
Preliminary assessment of climate change vulnerability
Location:
Accra, Ghana
Period of the service:
2019
Sixense expertises used:

Incorporating the climate consideration from the project design stage

As part of a response to a call for bids, Vinci Concessions wanted to take into account the potential infrastructure impacts of climate change as early as possible on the project, in order to adapt its preliminary design, its maintenance plans and the economic model.

 

Preliminary assessment of climate change vulnerability

Our Resallience engineering office, a specialist in climate resilience, was able to provide its advice and expertise to the customer at various stages:

  1. An assessment of infrastructure’s exposure to climate risks and climate factors by 2050, including a literature review and climate data analysis.
  2. Identification of critical issues for infrastructure in view of flood risks.
  3. The creation of maps summarising the infrastructure’s exposure and vulnerability to floods, dust storms and fires.
  4. A focus on the risks of flooding to validate the choice of drainage systems.

Images of the project

31,7

7km requiring rehabilitation

80%

of disasters are climate-related

14

major floods since 1995

9

climatic risks assessed by Resallience

Tags

Road networks Climate Resilience